Hook manufacturers briefly describe the running-in period of cranes

2025-08-14 05:13:00

  The hook manufacturer briefly describes the running-in period of the crane:

  1. Since cranes are special vehicles, operators should receive training and guidance from manufacturers, have a full understanding of the structure and performance of the machine, and obtain certain operating and maintenance experience before they can operate the machine. The product maintenance manual provided by the manufacturer is the best information for the operator to operate the equipment. Before operating the machine, you must first read the maintenance manual and operate and maintain it according to the requirements of the manual.

  2. Pay attention to the workload during the running-in period. The workload during the running-in period should generally not exceed 80% of the rated workload, and appropriate workloads should be arranged to prevent overheating caused by long-term continuous operation of the machine.

  3. Pay attention to the instructions of each instrument frequently. If abnormalities occur, stop the vehicle in time and eliminate it. Before the cause is not found and the fault is not ruled out, work should be stopped.

  4. Pay attention to check the level and quality of lubricating oil, hydraulic oil, coolant, brake fluid, and fuel oil (water) often, and pay attention to checking the sealing of the entire machine. If there is too much oil and water during the inspection, the cause should be analyzed. At the same time, the lubrication of each lubrication point should be strengthened. It is recommended that grease be added to the lubrication point during the running-in period (except for special requirements).

  5. Keep the machine clean and adjust and tighten loose parts in time to prevent the wear of parts from aggravating the loss of parts or causing the loss of parts.

  6. When the run-in period is over, the machine should be maintained for compulsory maintenance, inspection and adjustment should be done, and the oil should be replaced.

  In short, the requirements for use and maintenance of cranes during the running-in period can be summarized as: strengthening training, reducing load, paying attention to inspection, and strengthening lubrication. As long as you pay attention to and implement maintenance and maintenance of the crane during the running-in period as required, it will reduce the occurrence of early failures, extend the service life, improve operating efficiency, and bring more benefits to you. 

  The hook manufacturer briefly describes the running-in period of the crane:

  1. Since cranes are special vehicles, operators should receive training and guidance from manufacturers, have a full understanding of the structure and performance of the machine, and obtain certain operating and maintenance experience before they can operate the machine. The product maintenance manual provided by the manufacturer is the best information for the operator to operate the equipment. Before operating the machine, you must first read the maintenance manual and operate and maintain it according to the requirements of the manual.

  2. Pay attention to the workload during the running-in period. The workload during the running-in period should generally not exceed 80% of the rated workload, and appropriate workloads should be arranged to prevent overheating caused by long-term continuous operation of the machine.

  3. Pay attention to the instructions of each instrument frequently. If abnormalities occur, stop the vehicle in time and eliminate it. Before the cause is not found and the fault is not ruled out, work should be stopped.

  4. Pay attention to check the level and quality of lubricating oil, hydraulic oil, coolant, brake fluid, and fuel oil (water) often, and pay attention to checking the sealing of the entire machine. If there is too much oil and water during the inspection, the cause should be analyzed. At the same time, the lubrication of each lubrication point should be strengthened. It is recommended that grease be added to the lubrication point during the running-in period (except for special requirements).

  5. Keep the machine clean and adjust and tighten loose parts in time to prevent the wear of parts from aggravating the loss of parts or causing the loss of parts.

  6. When the run-in period is over, the machine should be maintained for compulsory maintenance, inspection and adjustment should be done, and the oil should be replaced.

  In short, the requirements for use and maintenance of cranes during the running-in period can be summarized as: strengthening training, reducing load, paying attention to inspection, and strengthening lubrication. As long as you pay attention to and implement maintenance and maintenance of the crane during the running-in period as required, it will reduce the occurrence of early failures, extend the service life, improve operating efficiency, and bring more benefits to you. 

  The hook manufacturer briefly describes the running-in period of the crane:

  1. Since cranes are special vehicles, operators should receive training and guidance from manufacturers, have a full understanding of the structure and performance of the machine, and obtain certain operating and maintenance experience before they can operate the machine. The product maintenance manual provided by the manufacturer is the best information for the operator to operate the equipment. Before operating the machine, you must first read the maintenance manual and operate and maintain it according to the requirements of the manual.

  2. Pay attention to the workload during the running-in period. The workload during the running-in period should generally not exceed 80% of the rated workload, and appropriate workloads should be arranged to prevent overheating caused by long-term continuous operation of the machine.

  3. Pay attention to the instructions of each instrument frequently. If abnormalities occur, stop the vehicle in time and eliminate it. Before the cause is not found and the fault is not ruled out, work should be stopped.

  4. Pay attention to check the level and quality of lubricating oil, hydraulic oil, coolant, brake fluid, and fuel oil (water) often, and pay attention to checking the sealing of the entire machine. If there is too much oil and water during the inspection, the cause should be analyzed. At the same time, the lubrication of each lubrication point should be strengthened. It is recommended that grease be added to the lubrication point during the running-in period (except for special requirements).

  5. Keep the machine clean and adjust and tighten loose parts in time to prevent the wear of parts from aggravating the loss of parts or causing the loss of parts.

  6. When the run-in period is over, the machine should be maintained for compulsory maintenance, inspection and adjustment should be done, and the oil should be replaced.

  In short, the requirements for use and maintenance of cranes during the running-in period can be summarized as: strengthening training, reducing load, paying attention to inspection, and strengthening lubrication. As long as you pay attention to and implement maintenance and maintenance of the crane during the running-in period as required, it will reduce the occurrence of early failures, extend the service life, improve operating efficiency, and bring more benefits to you. 